Project at a Glance

Project Name

OranjeWind Offshore Wind Farm

Project Type

Greenfield

Project Sector

Renewable Energy

Project Sub-sector

Wind power

Project Status

Pre-construction Stage

Project Location 

53 km off the coast of the Netherlands

Project Cost

Not disclosed

Project Developers

  • RWE: 50% stake

  • TotalEnergies: 50% stake

Wind Farm Capacity

795 MW

Grid Connection Capacity

760 MW

Project Start Date

2026 (Expected)

Project Completion Date

2028 (Expected)

Project Overview

The OranjeWind Offshore wind farm project is a joint venture between RWE & TotalEnergies, with a 50-50% share. It is a 795 MW wind farm project located off the coast of the Netherlands.

​The project is expected to start in 2026 and be fully commissioned by 2028. It has an annual power generation of approximately 3 terawatt-hours, enough to supply more than one million Dutch households. It has a grid connection capacity of 760 MW. During low production periods, it has an excess capacity of 35 MW to utilize the connection capacity smoothly.

​The project serves as a blueprint for integrating a wind farm into the Dutch energy system. It helps address the problems posed by shifts in power generation from wind and by flexible energy demand. The goal is to match scattered wind power generation with flexible energy demand to contribute to grid stability.

For this purpose, partners RWE & TotalEnergies will supply their allocated parts of the flexible system, including integration solutions such as electrolysers, battery storage, e-boilers, and smart charging, in multiple locations in the Netherlands.

OranjeWind Offshore Wind Farm Location

The OranjeWind Offshore wind farm project is located in the North Sea, approximately 53 kilometers off the coast of IJmuiden in the Netherlands. It is within the Hollandse Kust West VII site.

​Placed about 80 km from Den Helder port, it supports logistical access from nearby ports, such as Eemshaven (construction staging) and Den Helder (O&M base).

Project Background

The OranjeWind Offshore wind farm project originated in 2022, with RWE winning the tender to develop the Hollandse Kust West VII site. It is a German energy company with a great experience in offshore wind projects.

​In 2024, TotalEnergies, a French multinational energy firm, entered into a partnership with RWE, sharing a 50:50% stake in the OranjeWind project. The partnership marks the first collaborative offshore wind endeavor between the two companies in the Netherlands, leveraging RWE's leadership in development, construction, and operations.

​The project aligns with the Netherlands' ambitious offshore wind targets, which aim to install 21 GW by 2030 as part of the broader European push for net-zero emissions. It also aims to produce green power and hydrogen, while supporting the stability of the Dutch grid through its electric boilers and battery storage.

OranjeWind Offshore Wind Farm Current Status

As of January 2026, the OranjeWind Offshore Wind Farm project is in its pre-construction stage. It is expected to begin its construction later in 2026, and turbine installation in 2027. As for preparations, production planning is complete, the port logistics setup at Eemshaven and Den Helder is in place, and TenneT's grid connection is nearing completion.

40+ reviews

Find the Latest Offshore Wind Farm Projects In Northern Europe

Gain exclusive access to our industry-leading database of offshore wind opportunities with detailed project timelines and stakeholder information.

​Collect Your Free Leads Here!

No credit cardUp-to-date coverage

Joined by 750+ industry professionals last month

OranjeWind Offshore Wind Farm Project Cost

The total estimated cost for the OranjeWind Offshore Wind Farm project is not publicly disclosed.

Project Timeline

Date

Event

Early 2028

Expected completion of the project

Early 2027

Expected turbine installation for the project

2026

Construction expected to begin

July 2024

Turbine Order (Vestas)

July 2024

Partnership agreement signed between RWE & TotalEnergies

2022

RWE won the tender award for the project

Project Scope

The following is the project scope of OranjeWind Offshore Wind Farm:

  • Grid Connection: The wind farm is connected through TenneT's offshore AC substation and transmission system.

  • Wind Turbines: 53 × Vestas V236-15.0 MW offshore wind turbines will be installed.

  • Foundations: 53 monopile foundations (supplied by Sif Holding, including secondary steel components such as ladders, boat landings, and platforms).

  • Inter-Array Cables: Approximately 114 km of inter-array cables to connect turbines to the offshore substation

  • System Integration and Innovation: The project combines offshore wind with flexible demand assets, including electrolysers for green hydrogen production, e-boilers, battery storage, EV-charging solutions, and a demonstration floating solar farm to balance intermittent generation and support grid stability.

  • Ports and Logistics: Marshalling and pre-assembly at Buss Terminal Eemshaven; operation and maintenance base at the Port of Den Helder (Blue Port Centre), using a Service Operation Vessel (SOV).

OranjeWind Offshore Wind Farm Project Contractors

Contractors

Details

Vestas

53 X V236-15.0 MW turbines, supply, delivery, commissioning, and service

Sif

53 monopile foundations (76 kt total), ladders, platforms

TKF

Supply Inter-array Cables

DEME

Transport & install 114 km inter-array cables, secondary steel

Jan De Nul

Foundations & Turbine Installation

TenneT

Offshore grid connection agreements

40+ reviews

Find the Latest Offshore Wind Farm Projects In Northern Europe 

Gain exclusive access to our industry-leading database of offshore wind opportunities with detailed project timelines and stakeholder information.

​Collect Your Free Leads Here!

No credit cardUp-to-date coverage

Joined by 750+ industry professionals last month

Benefits

The following are the benefits of the project:

  • Electricity generation: The project generates 3TWh of clean, renewable electricity annually, enough to power one million Dutch households.

  • Meet Dutch decarbonization targets: The project meets Dutch decarbonization targets by producing green power and hydrogen via electrolyzers.

  • Improves grid connectivity: Enhances grid stability & connectivity through technologies such as e-boilers, battery storage, and smart EV charging.

  • Blueprint for Offshore projects: It serves as a blueprint for future offshore wind integration, matching intermittent supply with flexible demand.

  • Industrial Decarbonization: The project produces green hydrogen to fuel industrial decarbonization.

  • Boosts Economy: Boost the economy through local ports (Eemshaven, Den Helder) and contractor jobs.

Conclusion

The OranjeWind Offshore Wind Farm is a 795 MW capacity project located off the coast of the Netherlands. Developed by a joint venture between RWE & TotalEnergies, it has a grid connection capacity of 760 MW. Additionally, it has an excess capacity of 35 MW during low production periods.

It serves as a blueprint for future offshore wind integration, matching intermittent supply with flexible demand. The goal is to match scattered wind power generation with flexible energy demand to contribute to grid stability.

OranjeWind Offshore Wind Farm represents a pivotal advancement in sustainable energy for the Netherlands. Its success will accelerate Europe's renewable transition while creating economic value through local supply chains and jobs.

Track the Latest Offshore Wind Farm Projects in Northern Europe for Business Opportunities.

Subscribe to our upcoming and ongoing Offshore Wind Farm Projects in Northern Europe to access reliable, high-quality insights on forthcoming and completed infrastructure projects across the country.


Our user-friendly platform provides essential details, timely updates, key stakeholder contact information, and business opportunities tailored for engineering companies, industry professionals, investors, and government agencies.


Start a free demo to take your business to the next level.

Leave a Comment

We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.

We read every comment and do our best to respond to them all.

Protected by Cloudflare Turnstile